There are a number of important public meetings on transit planning this month on the Westside:
1. Metro Westside Extension (aka Wilshire "Subway to the Sea"), map above) Alternatives Analysis public meetings. "Please join Metro at one of five upcoming community meetings where you can comment on what you want Metro to study." All meetings are 6:00-8:00 p.m. (same content at each). More info.
Westwood/Century City - Tues., Oct. 9 - Emerson Middle School, 1650 Selby Ave., LA
Hollywood/West Hollywood - Thurs., Oct. 11 - Pan Pacific Recreation Center, 7600 Beverly Blvd., LA
Mid-Wilshire/Koreatown - Tues., Oct. 16 - LA Wilshire United Methodist Church, 4350 Wilshire Blvd., LA
Beverly Hills - Wed., Oct. 17 - Beverly Hills Public Library Auditorium, 444 North Rexford Dr., BH
Santa Monica - Thurs., Oct. 18 - Santa Monica Public Library, 601 Santa Monica Blvd., SM
2. Expo Line Phase 2 Initial Screening Results. All meetings are 6:30-8:30 p.m. Announcement flier (1.5 M PDF); Expo Construction Authority; Friends 4 Expo Transit.
Mon., Oct. 22 - Santa Monica Civic Auditorium East Wing Meeting Room, 1855 Main St., SM
Wed., Oct. 24 - Venice High School Auditorium, 13000 Venice Blvd., LA 90066
Thurs., Oct. 25 - (Cheviot Hills) Vista Del Mar Child and Family Services Gymnasium, 3200 Motor Ave., LA 90034
3. Santa Monica citywide Transportation Workshop, part of the Land Use and Circulation Element update. More info and rsvp.
Sat., Oct. 6, 9:00 a.m.-2:00 p.m., John Adams Middle School cafeteria, 2425 16th St., SM
4. Metro Crenshaw-Prairie Transit Corridor Alternatives Analysis public meetings. "Metro will consider several transit modes such as Metro Rapid Bus, Metro Rapid Transit (MRT) (a dedicated lane) and Light Rail Transit (LRT)." More info.
Mon., Oct. 15, 6-8 p.m., Darby Park, 3400 W. Arbor Vitae St., Inglewood
Wed., Oct. 17, 6-8 p.m., Nate Holden Performing Arts Center, 4718 W. Washington Blvd., Los Angeles
Sat., Oct. 20, 9-11 a.m., Audubon Middle School, 4120 11th Ave., Los Angeles
[Added] 5. Santa Monica Industrial Land workshop, including the Bergamont Station and Mid-City Expo Station locations, part of the Land Use and Circulation Element update. More info and rsvp.
Thu., Oct. 25, 6:00 or 7:00 p.m. [verify], Lincoln Middle School cafeteria, 1501 California Ave., SM
Thursday, October 04, 2007
October transit meetings
Tuesday, October 02, 2007
LA CityBeat
I'm featured in Alan Mittelstaedt's article "Dozing in the Slow Lane" in this week's CityBeat.
For more about the Expo Line light rail from downtown Los Angeles to Santa Monica and our advocacy for it, please see Friends 4 Expo Transit.
Tuesday, July 31, 2007
Lincoln bus lanes
Santa Monica Daily Press commentator Bill Bauer (page 5 in PDF) argues that:
Local politicians, planners and misguided "enviros" must stop backing schemes that reduce street capacity. It'll be a long time before mass transit (light rail, monorail, busses and subways) serves a sizable percentage of the public. In the meantime, streets should be configured ot move traffic efficiently, safely and expediently - not impede it.
... In Santa Monica, ... instead of using parking lanes on Lincoln Boulevard to ease congestion, City Council declared them exclusive "bus and bike only" lanes for the eight hourly busses and handful of bicyclists using the street. ...
Isn't a simpler solution to Santa Monica's traffic and parking congestion to have more people come into the city without bringing their cars with them? Bus-only lanes can provide a speed incentive to ride instead of drive plus greater people-carrying capacity.
That was the recommendation of the 2002-3 Lincoln Corridor Task Force. The illustration above shows its near-term recommendations: to use the opportunity of existing parking lanes in Venice and Ocean Park for peak-period bus- and bike-only lanes, plus to underground the power lines and add landscaped medians.
Santa Monica Big Blue Bus already operates four #3 buses and another four Rapid 3 buses per direction on Lincoln during peak periods. The ones I've seen are crowded beyond their 40 seats, carrying around 400 people/hour (50/bus x 8 buses/hour), despite being stuck in slow traffic. That's some 20% of the people traveling on Lincoln.
A boulevard lane maxes out at around 750 vehicles/hour, or 900 people/lane/hour at 1.2 people per vehicle. But a new mixed-flow curb lane would carry fewer, with cars stuck behind frequently stopping buses, whereas a dedicated bus lane can easily expand capacity with more buses and/or longer ones.
Saturday, June 23, 2007
Wilshire Monorail?
A monorail along Wilshire Boulevard has been suggested as a faster and cheaper alternative to extending the Purple Line "Subway to the Sea". Here are some considerations to evaluate whether a monorail could fit.
This image of the Las Vegas Monorail superimposed onto Wilshire in West Los Angeles shows the visual bulk of its concrete beams and columns, and how it blocks the left turn lane.
Las Vegas has the only transit monorail in the United States, begun construction in 2001 and opened in 2004. Its 2000 construction cost was $100 million/mile ($385 million for 3.8 miles; source). This was similar to elevated light rail, and about one-third the cost of subway construction. It would be more now, with construction cost inflation.
Las Vegas uses a proprietary Bombardier (Canada) design based on Walt Disney World. Hitachi (Japan), the world's other main monorail vendor, uses a different, incompatible, design. It's risky to be dependent on a single vendor.
Spans for the Las Vegas beams average 100 feet, with the longest about 120 feet. They are 26 inches wide and vary from 5 to 7 feet deep. The typical column is 56 inches by 32 inches (source). They likely would be larger in Los Angeles to meet our seismic requirements.
Aerial stations are quite large, cantilevered over the street with pedestrian bridges to the sidewalk, needing space for stairs, handicapped-accessible elevators, and possibly escalators (which tend to break in the weather). Is this acceptable on Wilshire?
Passengers would experience a 10-15 minute delay at Western Avenue, to transfer between aerial and subway stations and wait for another train.
What are alternatives to losing the left turn lane to columns? Las Vegas' 120-foot maximum span is far short of this typical boulevard intersection at Wilshire and Bundy, where it would take a 550 foot span across the left-turn lanes and cross street.
Even this massive bridge of the Green Line over Aviation and Rosecrans in the South Bay is only just over 300 feet.
The other possibility is "straddle bents" spanning the entire boulevard, like these three supporting a curve in Las Vegas. These would also be used if the beam curved to the edge of the boulevard if stations were built in buildings' upper floors.
For more perspectives see The Monorail Society and Light Rail Now.
(I plan a future post about monorails along freeways.)