Also on the LA City Council Transportation Committee agenda Wednesday is a staff recommendation (1.9MB pdf) to implement dedicated peak hour curb bus lanes on Wilshire Boulevard, per the map above (click to enlarge). Here are key excerpts.

Option A: Peak Period End-to-End Bus Lanes. Convert the curb lanes of Wilshire Boulevard within the City limits from mixed flow to bus and right turn only operation between Downtown LA and the Santa Monica City limit during weekday peak periods (7-9 AM and 4-7 PM). ...

BENEFITS

Option A would result in significant improvement for bus travel times and speeds. End-to-end Metro Rapid bus travel time within the City would be reduced by an average of 11.7 minutes from 48.0 to 36.3 minutes, or 24%. ...

IMPACTS

Conversion of the curb lanes from mixed flow to bus and right-turn only operation would mean that Wilshire Boulevard could carry fewer mixed flow vehicles during peak periods, resulting in significant adverse impacts on mixed flow traffic. The traffic impact analysis indicates that mixed flow travel time on Wilshire Boulevard in the peak periods would increase by an average of 26% (11 minutes). ...

These impacts would diminish over time if drivers find new routes or switch to transit. ...

As part of its Wilshire Bus Rapid Transit project, Metro is proposing to widen Wilshire Boulevard between Barrington Avenue and Bonsall Avenue (on the Veterans Administration property) in West LA to create new capacity for an eastbound peak period bus lane. ...

Street Pavement

It is anticipated that operation of the bus lanes in Option A would have a significant impact on the curb lane pavement due to the concentration of bus activity in the curbside lanes, The new 60-foot articulated buses, with a gross vehicle weight of 68,000 Ibs. and rear axle load of 30,000 Ibs., are much more damaging to pavement than 40-foot buses, with a gross vehicle weight of 42,000 Ibs. and rear axle load of 28,000Ibs. This would be especially problematic between Western Avenue and San Vicente Boulevard, where the pavement and concrete gutters are in generally poor condition. The curb lane pavement condition is also a problem for buses: Metro's bus operators are instructed to stay out of the Wilshire Boulevard curb lanes where possible.

As part of the Bus Speed Improvement Project, Metro is proposing to install 120' long concrete bus pads at all bus stops and intersection stops along Wilshire Boulevard (200 total), at a total cost of $6,8 million. This would substantially mitigate impacts to the pavement at locations where buses are most likely to stop.

MITIGATION MEASURES

In order to mitigate some of Option A's traffic impacts, certain segments of Wilshire Boulevard could be widened to create additional capacity for the new bus lanes: ...

San Vicente Boulevard to Fairfax Avenue - The north side of Wilshire Boulevard could be widened by reducing the sidewalk width, which is currently 20-23 feet, to create capacity for a new westbound bus lane. This would leave a 10-13 foot width sidewalk along the north side. ...

Like the Lincoln proposal below, this would prioritize people-carrying capacity of the boulevard while we wait for higher-capacity rail transit. It is also consistent with the fall 2006 "A Green Los Angeles" recommendations by the Green LA Working Group, which included more peak-hour bus-only lanes as one of its top-three transportation recommendations.