Wednesday, May 07, 2008

Wilshire subway planning

Here are the latest refined Westside Extension (aka Wilshire subway) maps (click images to enlarge) from Metro's public meetings this week. (Also see my 11/15/07 comments and the Subway to the Sea Coalition.)

The remaining alternatives — with the best performance — are two subway options along the Wilshire corridor, and those two with Hollywood branches added. The obligatory No Project, TSM (Transportation System Management), and BRT (Bus Rapid Transit) study options also remain. These are only general route and station locations; details will come in a later study phase.

Alt. 1. This is the basic Wilshire route, with different details from Century City to Westwood. Orange rectangles highlight changes from previous versions.

Alt. 14. This jogs north to serve Farmers Market and Cedars-Sinai. I like adding these destinations, but am concerned about slowing around three sides of a box, unlike the earlier version that diagonaled to Wilshire & Beverly.

Alt. 11. Here trains would also run between Santa Monica and Hollywood, transferring to the Red Line at Highland. I suggested considering a longer north-south route from Hollywood past Wilshire to perhaps the Crenshaw line to LAX.

Alt. 16. Hollywood branch added to the Farmers Market alternative.








Other notes:

  • The Santa Monica Blvd.-only options were dropped for lower ridership and cost-effectiveness.
  • Wilshire only — 71K new boardings (2030), 53K daily travel hours saved, $5.5B capital cost, $32/hour saved (FTA target is $25-35/hour saved)
  • Santa Monica only — 55K new boardings, 41K daily travel hours saved
  • Wilshire + Hollywood — 82K new boardings, 62K daily travel hours saved, $8B capital cost, $37/hour saved

The remaining two meetings are (6-8 p.m.):

  • Thursday, May 8, Santa Monica Public Library – Multipurpose Room, 2nd Floor, 601 Santa Monica Bl, SM
  • Monday, May 12, Plummer Park, 7377 Santa Monica Bl, West Hollywood

Wilshire Monorail—2

There were also these two great simulations of a monorail above Wilshire at Fairfax, using a Las Vegas station to show how much space it would take. The landmark former May Co. department store, now part of the LA County Museum of Art, is on the left.

Metro doesn't recommend further study of any aerial alternatives in this corridor, either HRT, LRT, or monorail. (click images to enlarge)

Stations are large, especially with pedestrian bridges for access. Straddle bents (the beams spanning the street) are used when there's not space for columns.

See my previous 6/23/07 post Wilshire Monorail? on this subject, also Flood channel monorails?

Olympic-Pico one-way

The LA Times reported yesterday, "Judge puts hold on L.A.'s Olympic-Pico traffic plan".
Mayor Antonio Villaraigosa's chief plan to speed traffic in Los Angeles was delayed Monday when a judge ruled that more study, which could take months, was needed before two Westside thoroughfares could be altered to work more like one-way streets. ...

In his five-page ruling, Torribio took particular umbrage to a claim by the city that the project didn't need to be studied because it wasn't a major change to how the streets were managed.

"In other words, the very purpose of the project is to expand the use of the existing streets," Torribio wrote. "To claim that the project will not expand the current use and is therefore exempt" from further study "seems inconsistent with the stated purpose." ...

Rather than creating major disruption for the questionable effectiveness of the city's plan, two simple improvements would help ease the bottleneck of getting east past the 405 freeway while we await major relief from completion of the Expo Line to Santa Monica:

  • Restripe a fourth eastbound lane to Olympic Boulevard from Barrington to Sepulveda.
  • Two lanes of Pico converge with two lanes of Gateway (Ocean Park) Blvd., narrowing to two lanes (photo above, click to enlarge) before widening to three lanes (past the big tree on the right). An obvious fix is to extend the third lane the short additional distance to the intersection. Street parking on Pico proposed to be removed farther west is much less the problem.

Saturday, January 26, 2008

Flood channel monorails?

For more on monorails (see also Wilshire monorail?), David Lazarus' 12/9/07 column "Southland transit is in need of big ideas" suggested:

Brian C. Brooks, an L.A. County Department of Public Works employee, believes he has the answer, which he shared with me after laying out a map of the county's system of flood channels.

"If you had a monorail system all over Los Angeles, along all the flood channels, it would be like having a magic carpet, carrying you above all the traffic," he said. "Absolutely this would work." ...

Brooks believes a monorail network can be built along L.A.'s flood channels for less than $35 million per mile, or a tenth the estimated cost of expanding the existing subway system. A 10-mile monorail line could be up and running in less than three years, he said.

"Californians are an above-ground people," Brooks said. "We don't want to be underground in a dark tunnel. We want to be above it all, in the light."

This image shows how a flood channel monorail could look, north from the Charnock Ave. bridge in Mar Vista, between McLaughlin and Sawtelle (enlarge).

I was a regular San Francisco Bay Area BART rider in the 1970s, and every time the train came out of the subway onto elevated track I enjoyed seeing daylight (or even night). So I'm another who prefers to ride above ground.

Monorails have operated in transit service in a number of cities around the world, and certainly have a cool factor from Disneyland, Disney World, etc. -- even if the Disneyland monorail only bumped across the parking lot at 25 mph.

But I'm concerned monorails are oversold, especially when a company claims costs and performance that it has never built. Here are three issues about monorails along flood channels: 1. Would they fit? 2. How much would they cost? 3. Would they go where people travel?

1. Fit. Running along storm channels raises issues of space for 5-6-foot wide columns and noise and visual impacts for neighbors, commonly single-family residential neighborhoods. I rather doubt that the owners of the houses on the right would welcome this past their back yards; some of the most heated opponents of the late Orange County CenterLine were Irvine homeowners along the flood channel where it would have been built.

The Las Vegas monorail (train used in image) is a close comparable to the unbuilt Metrail proposal Brooks cites. Las Vegas' Bombardier trains are about the same size but not as tall, also made of lightweight composite materials. The standard Las Vegas columns are 4'-8" x 2'-8" and 18+ feet tall. In Los Angeles they would likely be thicker to for our seismic standards; the L.A. Green Line's columns are about 6 feet in diameter.

Las Vegas trains are relatively quiet, but could not be called silent, with tire noise and a metallic whoosh as they pass. Metrail proposes to add an on-board engine instead of electric power, which would add to its noise, likely making it sound like a Long Beach diesel hybrid bus.

2. Cost. It's very unlikely a Metrail monorail could be built for one-tenth the cost of subway. The Las Vegas monorail was built between 2001 and 2004 for $100M per mile (source) by an experienced engineering company (see construction photos by The Monorail Society).

With Brooks's Metrail trains about the same size and weight as Las Vegas' its guideway and stations would be quite similar, while costs have inflated seriously since then. Best case is probably $100-150M per mile, at least 1/3 the cost of subway.

3. Usefulness. Finally, would monorails along flood channels put stations in places useful for travellers? In many cases, no.