Tuesday, December 02, 2008

First two Measure R rail projects

Measure R has officially passed with a final count of 67.93% YES!

Let's look at the next steps for the first two rail projects it will fund, Expo Line Phase 2 to Santa Monica and the Gold Line Foothill Extension to Azusa, construction potentially beginning on both in 2010 (click maps to enlarge; Expo, Foothill PDF sources).

Updated with the latest Expo Authority Board reports their schedule ahead is:

  • January/February 2009 - Public Hearings on Draft EIR
  • March/April 2009 - Board Adopts LPA
  • October 2009 - Final EIR
  • 2010 - Begin construction
  • 2014-15 - Revenue Service

And an email from the Metro Gold Line Foothill Extension Construction Authority listed these target dates for the Gold Line Phase 2A (Pasadena to Azusa):

  • November 2009 - Commencement of the design / build procurement process for both the Santa Anita Aerial Structure and the Foothill Extension Phase 2A Alignment.
  • August 2010 - Groundbreaking for Santa Anita Aerial Structure
  • February 2011 - Groundbreaking for Foothill Extension Phase 2A
  • December 2013 - Phase 2A Revenue Service

Sunday, November 23, 2008

After Measure R passes

Now that we can celebrate Measure R passing (67.65% YES on 11/21/08 provisional vote update), what projects will be built first and how can advocates help?

As specified in Measure R (Metro Map, click to enlarge), the new 1/2-cent sales tax begins collection on July 1, 2009. Its funding breakdown is:

35% new Metro Rail and Bus Rapid Transit capital
3% Metrolink commuter rail capital
2% Metro Rail capital improvements to existing lines
5% Rail Operations
20% Bus Operations
20% Highway Capital
15% Local Return for streets, bikeways, pedestrian improvements

The transit projects funded for completion in its first ten years are:

1-A Expo Line phase 2, Culver City to Santa Monica, $925M, starting construction 2010, opening FY 2013-15
1-F Gold Line Foothill Extension, $735M, starting construction 2010, opening FY 2015-17
1-H Green Line LAX Extension, $200M, FY 2015-28
1-B Crenshaw Corridor, $1,207M, FY 2016-18
1-I S.F. Valley Canoga Corridor BRT, $182M, FY 2016-18
1-J S.F. Valley N-S Corridors BRT, $68.5M, FY 2016-18

Even better, Roger Snoble said on KPCC 11/6/08 that construction of the Foothill Gold Line "is able to move ahead very quickly, right along with Expo" Line phase 2 to Santa Monica in 2010 (21:00), as well as the Green Line to LAX (19:30). He also emphasized, "the ordinance ... has a very clear expenditure plan ... when the project would be expected to be delivered ... the people voted on that schedule ...."

On accelerating the Purple Line Wilshire Subway (1-D Westside Subway Extension, $4,074M, FY 2034-36), the LA Times Bottleneck Blog reported: "During the news conference about Measure R's passage, Metropolitan Transportation Authority chief Roger Snoble said it may now be possible to extend the line to Fairfax Avenue within six or seven years and the line could get to Westwood in 20 years."

The important Regional Connector (1-C) between the Expo/Blue and Gold lines is expected to be competitive for federal funding (estimated $708M match to $160M local), which we hope can advance it from its current FY 2023-25 scheduled completion.

How can advocates help? With funding in place, we can now focus on helping Metro's planning process complete their designs well and move forward to construction. And advocate for cities to fund bicycle and pedestrian projects with their Local Return share.

Also see Ken Alpern's CityWatch column this week and my earlier posts Metro's sales tax would fund... and Sales tax comments for more.

Wednesday, November 05, 2008

Election success!

Congratulations President-elect Obama! His presidency, combined with Democratic majorities in Congress, will make possible the energy, climate, and transportation policies we need.

For some very moving photos of last night's acceptance speech, see these Grant Park photos from the Chicago Tribune.

Amazingly, Los Angeles County Measure R transportation sales tax sqeaked past its needed 2/3 majority at 67.41% YES (100% reported)!

The LA Times Bottleneck Blog gave a good description of the joyful press conference this morning at Wilshire & Western. Left are two UCLA student campaigners, and lower left are Steve Hymon with Mayor Antonio Villaraigosa and Metro CEO Roger Snoble (click to enlarge).

Proposition 1A for High Speed Rail finished at 52.2% YES. Now we'll have a lot of work ahead going from funding to completed plans to finished projects.

And the faux-clean-energy Propositions 7 and 10 were strongly defeated, 64.9% and 59.8% NO, respectively (100% reported). Four for four!

Wednesday, October 29, 2008

Proposition recommendations

NEW: I'm on KNBC TV supporting 1A and opposing 10.

On the four ballot measures next week about transportation and energy:

YES on 1A

Proposition 1A for California high-speed rail from San Francisco to Anaheim, with extensions to Sacramento and San Diego, would fund the state's $10B share to match private and federal money. Travel time from Los Angeles to San Francisco would be less than three hours.

Trains powered by domestic renewable electricity could reduce our oil dependence by 12.7 million barrels a year and eliminate 12 billion pounds of greenhouse gasses from many intra-state plane flights and long-distance car drives, using proven technology enjoyed in Europe and Asia.

This is the time to take high speed rail to its next step, investing in our infrastructure for California's economic future, like Governor Pat Brown's 1960s legacy. Is a $10 billion bond expensive? Not compared with highways and airport expansion, $6B to widen 99 to 6 lanes in the San Joaquin Valley, $20B to 8 lanes. And not compared with China's investment high speed rail for its place in the world economy.

Also see my earlier post on California High Speed Rail.

Links: Yes on 1A; Sierra Club on 1A; California High Speed Rail Blog; LA Times editorial


NO on 7

Proposition 7 has a laudable goal, but its critically flawed execution would set us back, the reason it's opposed by Sierra Club and other leading environmental groups – NRDC, Union of Concerned Scientists, California League of Conservation Voters; many in the renewable energy industry; the LA Times; and both political parties.

California already has a 20% Renewable Portfolio Standard (RPS) for 2010, and 33% for 2020, plus the statewide AB-32 plan to reduce global warming emissions to 1990 levels by 2020.

Prop. 7 does not address the real barriers to renewable energy – the need for reliable, predictable funding, such as a feed-in tariff – instead of creating rules for renewable contracts based on the unstable cost of baseload gas.

Its exclusion of less-than-30 MW providers (“solar and clean energy plant” is defined as a renewable energy generating “facility” with “a generating capacity of 30 Megawatts or more” in section 14) would cripple much of the renewables industry.

Its six-month “fast-track” provision would undermine environmental protections and existing collaboration on appropriate siting of renewable facilities and transmission corridors.

And it would be nearly impossible to correct these errors with its 2/3-majority legislative vote requirement.

Links: No on 7; Sierra Club on 7; LA Times editorial


NO on 10

Proposition 10 would spend $5B ($10B with bond interest) of state taxpayers’ money to subsidize natural gas vehicles and fueling infrastructure.

Mostly funded by T. Boone Pickens’ natural gas fueling station company Clean Energy Fuels Corp – $3.7M as of Sept. 30 – it is a wrong direction to a dead-end.

The right solutions to Global Warming and to reduce our oil dependence especially include efficiency, and electric vehicles and plug-in hybrids (PHEVs) that can use renewable electricity from wind, solar, and geothermal. One-third (36%) of California's greenhouse gas emissions are from from cars and trucks, and half of U.S. oil is used for motor gasoline.

Natural gas is merely another depleting fossil fuel. It provides little benefit toward the goal of 80% reduction in Global Warming emissions by 2050. In fact, it is 40% more efficient to make electricity for electric cars from gas than burn it in cars.

Proposition 10 is opposed by major environmental groups – Sierra Club, NRDC, Union of Concerned Scientists, California League of Conservation Voters – and over 30 newspapers. The LA Times called it a “reprehensible scam.”

Links: No on 10; Sierra Club on 10; LA Times editorial


YES on R

Measure R is a proposed half-cent 30-year Los Angeles County transportation sales tax.

Los Angeles County’s transportation needs far exceed existing local, state, and federal funding, and the political climate both in the state and in Washington DC is not likely to increase those levels any time soon. That is why this comprehensive countywide plan was developed, in consultation with a coalition of transit, environmental, labor, and business groups.

Two-thirds (65%) of Measure R will fund critical expansion of our rail transit network and transit operations. Bus riders will receive the benefits of a 70% annual increase over current bus operations funding, to reduce fare increases and improve service. And Local Return funds can support new bicycle and pedestrian projects.

See my earlier posts Metro's sales tax would fund... and Sales tax comments for more.

Links: Yes on Measure R; Metro on R; LA Times editorial